De-Flooding & Re-Engineering of Parking Lot at Ecobank Branch, Chevron Drive, Lagos

Project Overview

This project involved the de-flooding and re-engineering of the existing parking lot at the Chevron Branch of Ecobank, Lagos. The initiative was designed to resolve recurring flooding issues, enhance traffic management, and create a safe, durable, and well-structured parking environment that aligns with modern banking infrastructure standards.Key aspects of the project included establishing a new topographic level to improve drainage, layer compaction for structural strength, and the application of 8mm HFP paving stones for a refined, long-lasting finish. The redesign also prioritized vehicular flow, optimized water drainage, and overall user safety, while enhancing the visual ambience of the facility.

Client: Ecobank Nigeria Plc

Location: Chevron Drive, Lagos

Category: Banking | Civic Infrastructure

Service: Parking Lot De-Flooding, Structural Re-Engineering & Paving

Scope of Work

The project scope was executed across several key phases:

Site Preparation & De-Flooding

• Assessment and excavation of the existing flood-prone parking lot.

• Installation of improved drainage pathways to eliminate water logging.

Topographic Re-Engineering

• Adjustment of site levels to achieve a balanced gradient for water flow.

• Re-grading of the parking area to direct surface runoff away from key access points.

Layer Compaction & Base Preparation

• Mechanical compaction of multiple soil layers to achieve a solid base.

• Deployment of advanced compaction equipment for long-term ground stability.

Paving & Finishing

• Installation of 8mm HFP paving stones across the entire parking lot.

• Precision finishing for durability, aesthetics, and skid resistance.

Traffic Management Design

• Introduction of a new parking layout to streamline entry, exit, and circulation.

• Provision for optimized vehicular flow and safety compliance.

Challenges & Solutions

Challenge: Frequent flooding during heavy rains causing damage and inconvenience.

Solution: Redesign of drainage system with improved gradients and soil compaction to ensure free flow of water.

Challenge: Maintaining operational access for customers during construction.

Solution: Work was executed in carefully planned phases, allowing continued branch activity with minimal disruption.

Project Outcome

A fully re-engineered and flood-resistant parking lot.Optimized vehicular access with a new traffic-friendly layout.

Durable finishing with 8mm HFP paving stones ensuring long-term usability.

A safer, more convenient, and visually appealing environment for both staff and customers.

Impact

This project significantly improved the operational efficiency and customer experience at the Chevron Branch of Ecobank. By eliminating flooding challenges and optimizing traffic flow, the facility now provides a modern, durable, and safe parking solution that reflects Ecobank’s commitment to customer satisfaction and infrastructural excellence.

The successful completion of this project enhances not only functionality and safety, but also the ambience and brand image of the branch making it a model for banking infrastructure development across Lagos.

100+