Project Overview
This project involved the re-engineering, structural redesign, and civil works upgrade of the EPAC Car Park area at the prestigious Ecobank Head Office, Victoria Island, Lagos. The initiative was commissioned in preparation for the grand opening of the facility, with the objective of enhancing durability, aesthetics, safety, and traffic capacity.
Our team was tasked with carrying out comprehensive maintenance works, civil construction, and finishing touches under a tight three-week delivery schedule. Despite the short timeframe, the project was executed with precision, leveraging modern construction techniques and expert coordination to meet international standards.
Client: Ecobank Nigeria Plc
Location: Victoria Island, Lagos
Category: Banking & Civil Infrastructure Development
Service: Structural Re-Engineering, Car Park Civil Works & Finishing
Scope of Work
The project covered several critical phases of construction and finishing, including:
• Site Preparation & Earthworks
• Deployment of heavy-duty graders and compactors for site clearance.
• Sand filling, leveling, and grading of the car park area to optimize traffic flow.
• Excavation and backfilling to prepare the site for structural reinforcements.
• Structural Redesign & Reinforcement
• Re-engineering of car park structural elements to increase load-bearing capacity.
• Reinforcement of critical foundations and integration of durable materials for long-term use.
• Installation of protective barriers and traffic management infrastructure.
• Civil Construction Works
• Paving and concreting of driveways, pedestrian walkways, and access points.
• Drainage improvements to prevent waterlogging and ensure sustainability.
• Installation of road markings and directional signs to enhance safety.
• Steel & Canopy Installations
• Fabrication and installation of structural steel frameworks for the glass canopy.
• Precision alignment and reinforcement of the canopy system to enhance aesthetics and durability.
• Incorporation of architectural design elements that align with Ecobank’s corporate image.
• Electrical & Finishing Works
• Installation of lighting systems for improved security and visibility at night.
• Polishing, painting, and surface finishing to deliver a modern and professional look.
• Quality assurance testing to ensure compliance with safety and building standards.
Challenges & Solutions
Challenge: Tight Project Timeline (3 Weeks).
Solution: We deployed multiple work teams, ran extended shifts, and coordinated activities in parallel to ensure timely delivery without compromising quality.
Challenge: Maintaining Structural Integrity During Redesign.
Solution: Advanced engineering simulations and reinforcements were applied to balance durability with architectural aesthetics.
Challenge: Working in a High-Traffic, High-Security Banking Environment.
Solution: Strict adherence to safety protocols and seamless collaboration with Ecobank’s facility management team ensured uninterrupted operations during construction.
Project Outcome
• A durable and structurally enhanced car park designed to accommodate increased traffic flow.
• Modernized canopy installation that provides both weather protection and architectural appeal.
• Fully functional, safe, and visually appealing car park area delivered in record time for the Ecobank Head Office grand opening.
• Reinforced reputation for excellence in delivering high-value infrastructure projects under strict deadlines.
Impact
This project plays a key role in strengthening Ecobank’s corporate presence in Lagos by providing a state-of-the-art car park facility that matches the prestige of its Head Office. It ensures smooth vehicular movement, improved user safety, and an enhanced customer experience for both staff and visitors.
Our successful execution within three weeks highlights our capacity for speed, quality, and innovation in delivering critical infrastructure projects that support Nigeria’s growing financial sector.